Corrective Action
Records: 6
| ID | Name | Action Number | Action Type | Title | Description |
|---|---|---|---|---|---|
| 1 | BL-ACT-2026-00016 — Require MIC recalculation on a... | BL-ACT-2026-00016 | PROCEDURE_CHANGE | Require MIC recalculation on any charge deviation | Amend the charging deviation procedure so that any... |
| 2 | BL-ACT-2026-00017 — Recalibrate the site vibration... | BL-ACT-2026-00017 | TECHNICAL_REVIEW | Recalibrate the site vibration prediction model fo... | Commission a site-specific attenuation study using... |
| 3 | BL-ACT-2026-00018 — Remove out-of-calibration inst... | BL-ACT-2026-00018 | COMPLIANCE | Remove out-of-calibration instruments from the ava... | Add calibration expiry to the instrument availabil... |
| 4 | BL-ACT-2026-00019 — Resolve the 3.5 kg explosives ... | BL-ACT-2026-00019 | INVESTIGATION | Resolve the 3.5 kg explosives variance on BL-2026-... | Investigate the 3.5 kg unexplained emulsion varian... |
| 5 | BL-ACT-2026-00020 — Protect detonator downlines du... | BL-ACT-2026-00020 | PROCEDURE_CHANGE | Protect detonator downlines during stemming | Introduce a downline protection sleeve at the coll... |
| 6 | BL-ACT-2026-00021 — Redrill or backfill uncharged ... | BL-ACT-2026-00021 | REDRILL | Redrill or backfill uncharged hole NP480-007 | NP480-007 collapsed at 4.2 m and was never charged... |
1 : 6 : 6
of 1